OEM/ODM Factory er Q235 Oil Well Tubing Pipes/galvanized Steel Pipe/oil And Gas Steel Tube For Pipeline Youfa brand the biggest manufacturer for carbon steel pipe

Short Description:


  • Min.Order Quantity: One container
  • Production time: usually 25 days
  • Port: Xingang Tianjin Port in China
  • Payment Terms: L/C,D/A,D/P,T/T
  • Product Detail

    Product Tags

    We depend on sturdy technical force and continually create sophisticated technologies to meet the demand of OEM/ODM Factory er Q235 Oil Well Tubing Pipes/galvanized Steel Pipe/oil And Gas Steel Tube For Pipeline Youfa brand the biggest manufacturer for carbon steel pipe, Living by good quality, improvement by credit score is our eternal pursuit, We firmly feel that soon after your take a look at we will become long-term associates.
    We depend on sturdy technical force and continually create sophisticated technologies to meet the demand of Galvanized Steel Pipe, Gi Pipe Steel, Iron Steel Pipe, By adhering to the principle of "human oriented, winning by quality", our company sincerely welcomes merchants from at home and abroad to visit us, talk business with us and jointly create a brilliant future.

    Product Hot Dip Galvanized Steel Pipe
    Material Carbon Steel
    Grade Q195 = S195 / A53 Grade A
    Q235 = S235 / A53 Grade B / A500 Grade A / STK400 / SS400 / ST42.2
    Q345 = S355JR / A500 Grade B Grade C
    Standard EN39, BS1139, BS1387, EN10255,ASTM A53, ASTM A500, A36, ASTM A795,ISO65, ANSI C80, DIN2440, JIS G3444,

    GB/T3091, GB/T13793

    Surface Zinc coating 200-500g/m2 (30-70um)
    Ends Plain ends
    with or without caps

    Strict Quality Control:
    1) During and after production, 4 QC staffs with more than 5 years experience inspect products in random.
    2) National accredited laboratory with CNAS certificates
    3) Acceptable inspection from third party appointed/paid by buyer, such as SGS, BV.
    4) Approved by Malaysia, Indonesia, Singapore, Philippines, Australia, Peru and UK. We own UL /FM, ISO9001/18001, FPC certificates.


    learn more about certificates

    quality control

    Packing and Delivery:
    Packing Details : in hexagonal seaworthy bundles packed by steel strips, With two nylon slings for each bundles.
    Delivery Details : Depending on the QTY, normally one month.



  • Previous:
  • Next: